| descrizione |
The PES ENGINEERING Company grew out of the Engineering Division of PES, founded in 1979, and currently has more than 140 resources in its permanent engineering staff, boasting significant experience in the Oil & Gas, Power, Renewable Energy, Chemical, Petrochemical, and Automotive sectors.
The PES ENGINEERING Company provides engineering and technical services (Civil, Rotating Machinery, Static Equipment, Process, HSE Design, Electro-instrumental, Layout & Piping), offering over 200000 hours of engineering per year to all major Oil & Gas Companies, EPC Contractors, Industrial Manufacturers, etc.
Currently, PES ENGINEERING Company can count on 7 Locations in Italy: HQ in Rosignano Solvay (LI), San Donato Milanese, Florence, Rome, Bari, Vibo Marina (VV), Gela.
Abroad, PES Group is present in 3 countries (UK,UAE Romania). In addition, a series of strategic partnerships, signed in virtually all continents, support the Company to perform multidisciplinary engineering, service, service management, inspection & expediting, recruitment & hiring of local personnel.
Construction Quality Control Test Pack Coordinator
The Test Pack Coordinator is the focal point of all Projects’ piping test package site activities coordinating execution priorities, test circuits’ identification, test package folders’ preparation, walkthroughs, punch list clearance, quality documentation readiness, test execution and reinstatements.
Activity and Main Responsibilities:
- To interface with engineering department to receive system subdivision on P&Ids and share it with the mechanical Subcontractor(s)
- To consolidate priorities involving Field Engineering, Site project Control, Construction and Commissioning site teams concerning the site testing activities.
- To interface with the mechanical Subcontractor(s) to receive the test circuits limits, the test packages and the blind list to be verified and approved by site team.
- To lead the test pack process flow giving priority to the walk throughs, punch list and NDT clearance and test execution based both on actual line progress and PCC system priorities.
- To update the Data Base for the test pack progress monitoring.
- To assess productivities and progress of the various steps of the test pack workflow, identify bottl necks and take the necessary mitigation measures to sort them out.
- To liase with the construction supervision for punching and punch clearance. To liase with the QC team for NDTs and quality forms clearance.
- To liaise with Subcontractor(s) and the internal construction supervision team for the mechanic preparation for the test execution.
- To liaise with QC team for the RFIs relevant to the various steps as per the applicable Quali Control Plan.
- To liaise with the Notified Body whenever required, if applicable.
- To liaise with HSE team for the test execution and the relevant required barricading.
- To liaise with HSE team and Owner in case of pneumatic test to evaluate the safe area, to set u the barricading and issue a dedicated site bulletin.
- To liaise with Project Commissioning team for cleaning circuits handover and final reinstateme activities.
- To trigger the handover for painting touch ups and heat tracing installation. To trigger the handover for insulation installation
- To ensure proper reporting and to lead progress review meeting with involved site functions
- Solid prior experience in the Oil & Gas sector, with a focus on offshore or onshore projects.
- Technical Skills: In-depth knowledge of construction procedures, reading technical drawings and industry regulations.
- Languages: Excellent command of Italian – essential.
- Soft Skills: Leadership, problem-solving skills and stress management.
|